HG Turf Home Page About Us Products Sports Fields HG Turf Update Contact Us

Overview

The HG Team

Natural Turf

Synthetic Turf (Landscape)

Synthetic Turf (Sports)

Lawn Seed

Fertiliser

Overview

Major Projects

Surfaces & Systems

Water Restrictions

Current News

Media Releases

Testimonials

SPORTS AND COMMERCIAL

Sports and Commercial Overview

MAJOR PROJECTS

ANZ Stadium

Asian Games - Doha 06'

Aust. Institute of Sport

Brisbane Cricket Ground

Canberra Stadium

Commonwealth Games 06'

Eden Park (NZ)

Melbourne Cricket Ground

Telstra Stadium

Telstra Dome

SURFACES & SYSTEMS

Motz Stabilized Turf (TSII)

High Performance Gravity

Prescription Athletic Turf

EDEN PARK - Auckland (New Zealand)

Eden Park is recognized as New Zealand’s premier stadium, hosting many international rugby union and cricket fixtures. The old playing surface had come under much criticism for its poor drainage. In 2002 the Eden Park Board of Control undertook a worldwide tour of Stadia to determine the best turf and field system for Eden Park. They decided upon HG Turf’s Motz Stabilised Turf and High Performance Gravity (HPG) field system. The Board appointed HG Turf as head contractor for the project, after witnessing HG Turf’s success and experience in the Australian stadium market.

A team from HG Turf spent two months in Auckland. The old field was excavated, a new drainage and irrigation system was installed, and a new sand profile was built ready for the Motz Stabilised Turf to be laid. The Motz Stabilised Turf was planted in a local nursery six months prior to the reconstruction, matured, and then harvested and laid in preparation for the first event within two weeks.

Again the window for completing the works was tight, scheduled between cricket and rugby union, with the Auckland weather providing its own challenges.

VARIOUS STAGES OF THE EDEN PARK PROJECT

1 - Excavate Old Field
4,000 cubic metres including 200 cubic metres of basalt rock.

2 - Prepare New Subgrade
Bulk earth removal & subgrade trimming.

3 - Trenching
Rocksaw trench lines through basalt rock - 2,903m.

4 - Drainage Pipe
Line trenches with geo textile and install drainage pipe.

5 - Place Gravel
Install 75mm gravel blanket over drain pipe.

6 - Laser Gravel
Laser level gravel blanket to design tolerance.

7 - Irrigation Setout
Layout of irrigation system, prior to dropping system onto subgrade.

8 - Irrigation Assembly
Irrigation head and valve assembly, utilising Rainbird decoder system enabling individual head control via PC.

9 - Place Sand
Install 4,650 cubic metres of root zone sand to a depth of 300mm.

10 - Laser Sand
Laser level root zone sand to design slope 1% and tolerance.

11 - Temporary Seating
Place temporary seating prior to turf installation.

12 - Lay Motz Stabilised Turf
Rugby Field 9,600 square metres.

 

13 - Lay Washed Turf
5,000sqm surrounding Motz Stabilised Turf.

14 - Project Completion
In total 2 months.